EICR pre-inspection checklist
- Provide full property address including the Flat/House number.
- Full access to the electrical consumer unit. Remove any kind of obstruction to get clear access to the fusebox
- Need access to all the bedrooms, kitchen, and bathrooms. If any rooms are not accessible then an observation will be written in the EICR report.
- The main power should be connected and live. The PAYG meters should have enough credit.
- The Sockets and switches need clear access for earth and polarity checks. Engineer remove sockets and switches and fit them again.
- The main power switch can be shut down for 10-30 mins. So all the electrical appliances will be automatically off during this dead test.
- Occupier/tenant needs to unplug sensitive electrical appliances during the EICR testing.
- Protect your Children and pets in a safe place during the inspection. It's dangerous to play with electrician tools. So please keep a safe distance.